Friday, October 2, 2009

Roof, Electrical, Floor Finish


By the end of next week we hope to have the roof completed, floor stained, and most of the electrical and carpentry done.

We're leaning towards a grey floor (at right, perhaps tinted with a weak black stain) in the kitchen/dining room, with "cola" (lower left) in the bedroom suite.

The amazing gutter will get a workout this weekend. Lots of rain predicted.


The doors will be delivered on Tuesday; then the siding can be finished.


The new circuit breaker - almost all new wiring.


Wiring and plumbing is in order now.


Meanwhile, everybody is very much at home in Kitty Villa.