Smith / Dodd Family Roundup
Adventures of the Smith-Dodd Family
Saturday, September 5, 2009
Wood, Concrete, Rain
The lumber was delivered on Thursday...
The slab was poured in the former kitchen...
Then it poured: 2 1/2 inches on Friday night. A little water got into the living room, the construction dust washed away, and the backyard became 6 inches of mud.
Newer Post
Older Post
Home
Blog Archive
►
2011
(1)
►
July
(1)
►
2010
(10)
►
December
(1)
►
July
(1)
►
June
(1)
►
April
(3)
►
February
(1)
►
January
(3)
▼
2009
(42)
►
December
(3)
►
November
(10)
►
October
(3)
▼
September
(7)
Metal Roof and Siding
Going Up Fast
Taking Shape Before the Rain
OMG. Taking Form Today.
Wood, Concrete, Rain
They Pulled the Forms Away Today
We Have Concrete
►
August
(14)
►
July
(4)
►
January
(1)
Followers